-Module 3 of 4557 m2 and height of 6 m.
-Office area of 276 m2 and height of 3 m.
-Manoeuvring yard and access via Av. Lomas Verdes
-4 depressed docks for trailers, bumpers, and dock doors
-130 parking spaces
-Clean energy generators
-Infrastructure for electric vehicles
-Project aimed at LEED certification
-Concrete floors (resistance of 5 ton/m)
-Roof system based on KR-18 sheet metal
-Completely new electrical installation (substation, wiring, controls, etc.) Capacity: 50 KVAS per 1,000 m
-Natural light according to LEED standards and suspended high bay LED luminaires Lux/m 300 lux
-CCTV system in common areas
-Security booths with turnstiles on both access streets
-74 m of common areas equipped with bathrooms, kitchenette, vending machines, and a private room (or meeting room)
-Will have solar panels (to provide a minimum of 25% of total energy) and preparations for electric vehicle chargers (EV-ready infrastructure)
-Available from Q4 2023-Modulo 3 de 4557 m2 y altura de 6 m.
-Area de oficinas de 276 m2 y altura de 3 m.
-Patio de maniobras y acceso por Av. Lomas Verdes
-4 andenes deprimidos para tráiler, bumpers y puertas de andén
-130 lugares de estacionamiento
-Generadores de energía limpia
-Infraestructura para vehículos eléctricos
-Proyecto con objetivo de certificación LEED
-Pisos de concreto (resistencia de 5 ton/m)
-Sistema de techos a base de lámina KR-18
-Instalación eléctrica completamente nueva (subestación, cableado, controles, etc.) Capacidad: 50 KVAS por cada 1,000 m
-Luz natural acorde con estándares LEED y luminarias LED tipo high bay suspendida Lux/m 300 lux
-Sistema CCTV en áreas comunes
-Casetas de seguridad con esclusas en ambas calles de acceso
-74 m de áreas comunes equipadas con baños, cocineta, máquinas expendedoras y un privado (o sala de juntas)
-Contará con paneles solares (para proveer un
mínimo del 25% de la energía total) y preparaciones para cargadores de vehículos eléctricos (EV-ready infrastructure)
-Disponible a partir del 4T23